Archery, Waterslide, Challenge Course Upgrade

$0

Goal Reached

Total

In spring of 2025, we will be doing some much needed maintance on our Archery Range, Waterslide, and Challenge Course. These activites are a staple for both our summer camps as well as the many guests who use the camp throughout the year.

Projects Include:

Waterslide:
The pool at the bottom of the 200 ft waterslide is leaking. We will need to dig out the pool area and then put a new liner in at the bottom of the waterslide.

Archery:
We have moved our archery range to the back field behind the Challenge Course. This will allow us to expand the range and improve it for summer camp and for guests. We need to do a little bit of excavation work and build a small pavilion to shoot from.

Challenge Course:
Our high ropes course will need a new zip cable before operation in 2025. In addition, we need to set a few poles to keep some of our low elements which are being overgrown by trees.